Cerro Viento metro station
Estación Cerro Viento | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Panama Metro station | |||||||||||
![]() | |||||||||||
| General information | |||||||||||
| Location | Avenida Domingo Díaz Rufina Alfaro, San Miguelito Panama City Panama | ||||||||||
| Coordinates | 9°03′01.9″N 79°27′05.7″W / 9.050528°N 79.451583°W | ||||||||||
| Line(s) | Line 2 | ||||||||||
| History | |||||||||||
| Opened | 25 April 2019 | ||||||||||
| Services | |||||||||||
| |||||||||||
| |||||||||||
Cerro Viento is a Panama Metro station on Line 2. It was opened on 25 April 2019 as part of the inaugural section of Line 2 between San Miguelito and Nuevo Tocumen.[1] This is an elevated station[2] built above Avenida Domingo Díaz. The station is located between Brisas del Golf and San Antonio.[1] This station provides access to Centro Comercial Los Pueblos with an exit, and to Metromall with a footbridge.
References
- ^ a b Schwandl, Robert. "Panamá". urbanrail.
- ^ "Panama Metro Line 2 is operational". Newsroom Panama. 25 April 2019.
_(2).jpg)