Indrawati III Hydropower Station
| Indrawati III Hydropower Station | |
|---|---|
![]() Location of Indrawati III Hydropower Station in Nepal  | |
| Official name | Indrawati III Hydropower Project | 
| Country | Nepal | 
| Coordinates | 27°51′38″N 85°35′24″E / 27.86056°N 85.59000°E | 
| Purpose | Power | 
| Status | Operational | 
| Owner(s) | National Hydropower Company Limited | 
| Dam and spillways | |
| Type of dam | Gravity | 
| Impounds | Indrawati River | 
| Commission date | 2059-06-21 BS | 
| Type | Run-of-the-river | 
| Hydraulic head | 65 m (213 ft) | 
| Installed capacity | 7.5 MW | 
| Annual generation | 50 GWh | 
Indrawati III Hydropower Station (Nepali: इन्द्रावती ३ जलविद्युत आयोजना) is a run-of-river hydro-electric plant located in Sindhupalchok District of Nepal. The flow from Indrawati River, a tributary of Sunkoshi River, is used to generate 7.5 MW electricity with annual energy of 50 GWh. The design flow is 14 m3/s and design gross head is 65 m.[1] The plant is owned and developed by National Hydropower Company Limited, an IPP of Nepal. The plant started generating electricity since 2059-06-21 BS. The generation licence will expire in 2104-09-29 BS, after which the plant will be handed over to the government.[2] The power station is connected to the national grid and the electricity is sold to Nepal Electricity Authority. [3]
See also
References
- ^ Limited, N. H. P. C. (n.d.). Retrieved November 16, 2020, from https://nhpcl.com/
 - ^ "Operating Projects :: Hydro (Above 1MW)".
 - ^ Annual Report 2019/2020. Nepal Electricity Authority.
 