Line 3 (Shenyang Metro)
| Line 3 | |
|---|---|
![]() Line 3 train at Ningguan station | |
| Overview | |
| Status | Operational |
| Owner | Shenyang |
| Locale | Shenyang, Liaoning, China |
| Termini |
|
| Stations | 14 |
| Service | |
| Type | Rapid transit |
| System | Shenyang Metro |
| Operator(s) | Shenyang Metro Corporation |
| History | |
| Opened | 30 December 2024 |
| Technical | |
| Line length | 23 km (14.29 mi) |
| Number of tracks | 2 |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line 3 of the Shenyang Metro (Chinese: 沈阳地铁3号线) is a rapid transit line in Shenyang, China.[1]
Opening timeline
| Segment | Commencement | Length | Station(s) | Name |
|---|---|---|---|---|
| Lida — Nanliguan | 30 December 2024 | 23 km (14.29 mi) | 14 | Phase 1 |
Stations
| Station name | Transfer | Distance km | Location | |||
|---|---|---|---|---|---|---|
| Pinyin | Chinese | |||||
| Lida | 李达 | Tiexi | ||||
| Tiexiqichegongchang | 铁西汽车工厂 | |||||
| Mabei | 马贝 | |||||
| Zhongdedajie | 中德大街 | |||||
| Xiheyougu | 细河悠谷 | |||||
| Zhaijia | 翟家 | |||||
| Gongyedaxue | 工业大学 | |||||
| Ningguan | 宁官 | |||||
| Yuliang | 余良 | |||||
| Ganguan | 甘官 | Yuhong | ||||
| Qiandaohujie | 千岛湖街 | |||||
| Nanyanghujie | 南阳湖街 | |||||
| Datonghujie | 大通湖街 | 9 | ||||
| Nanliguan | 南李官 | |||||
