Guangming station
![]() | ||||||||||||||||
| General information | ||||||||||||||||
| Location | Guangming District, Shenzhen, Guangdong China | |||||||||||||||
| Operated by | SZMC (Shenzhen Metro Group) | |||||||||||||||
| Line(s) | ||||||||||||||||
| Platforms | 4 (2 island platforms) | |||||||||||||||
| Tracks | 4 | |||||||||||||||
| Construction | ||||||||||||||||
| Structure type | Elevated | |||||||||||||||
| Accessible | Yes | |||||||||||||||
| History | ||||||||||||||||
| Opened | 18 August 2020 (Line 6) 28 November 2022 (Line 6 Branch) | |||||||||||||||
| Services | ||||||||||||||||
| ||||||||||||||||
Guangming station (Chinese: 光明站; pinyin: Guāngmíng zhàn), is a station of Line 6 and Line 6 Branch of the Shenzhen Metro. Line 6 platforms opened on 18 August 2020 and Line 6 Branch platforms opened on 28 November 2022.[1]
Station layout
| 3F Platforms | Platform | |
| Island platform, doors will open on the left | ||
| Platform | 6 towards Science Museum (Guangming Street) | |
| Platform | 6B reserved platform | |
| Island platform, doors will open on the right | ||
| Platform | 6B towards SIAT (Zhenmei) | |
| 2F Concourse | Lobby | Customer Service, Shops, Vending machines, ATMs |
| G | - | Exit |
Exits
| Exit | Destination |
|---|---|
| Exit A | Xinjianxing Science and Technology Park, Cuihu Park |
| Exit C | Shenzhen Second Vocational and Technical School |
| Exit D |
References
External links
- Shenzhen Metro official page (Chinese)
- Shenzhen Metro official page (English)
- Street map
