Line 8 (Xi'an Metro)
| Line 8 | |
|---|---|
![]() A Line 8 train | |
| Overview | |
| Native name | 西安地铁8号(环)线 |
| Status | Trial operation |
| Owner | Xi'an |
| Locale | Xi'an |
| Termini | Loop line |
| Stations | 37 |
| Service | |
| Type | Rapid transit |
| System | Xi'an Metro |
| Services | 1 |
| Operator(s) | Xi'an Metro Ltd |
| Depot(s) | Yanminghu |
| History | |
| Opened | 26 December 2024[1] |
| Technical | |
| Line length | 49.9 km (31.0 mi) |
| Number of tracks | 2 |
| Character | Underground |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line 8 of Xi'an Metro (Chinese: 西安地铁八号(环)线; pinyin: Xī'ān Dìtiě Bāhào (Huán) Xiàn) is a loop line in Xi'an, Shaanxi Province, China. It opened on 26 December 2024.[1] The line is 49.9 km (31.0 mi) in length with 37 stations. The line is colored yellow on system maps.
History
The construction of Line 8 started on 30 October 2019,[2] and was finished in late June 2024[3] After various trial operations without passengers, a trial ride was open to the public on 22 December 2024,[4] and formal operations started on 26 December 2024.[1]
Stations
| Station name | Connections | Distance km | Location | ||
|---|---|---|---|---|---|
| English | Chinese | ||||
| — ↑ Loop line - towards Shengtiyuguan ↑ — | |||||
| Shanmenkou | 山门口 | Yanta | |||
| Anhuamen | 安化门 | ||||
| Dongyilu | 东仪路 | ||||
| Dianshita | 电视塔 | 2 | |||
| Datangbuyecheng | 大唐不夜城 | ||||
| Qujiangchixi | 曲江池西 | 4 | |||
| Hanyao | 寒窑 | ||||
| Xinkaimen | 新开门 | ||||
| Miaojiazhai | 缪家寨 | ||||
| Zhiwuyuan | 植物园 | ||||
| Matengkong | 马腾空 | 5 | |||
| Dongdengjiapo | 东等驾坡 | ||||
| Xidengjiapo | 西等驾坡 | ||||
| Wanshounanlu | 万寿南路 | 6 | Xincheng | ||
| Hansenzhai | 韩森寨 | ||||
| Wanshoulu | 万寿路 | 1 | |||
| Xingfulindaibei | 幸福林带北 | ||||
| Mijiaya | 米家崖 | Baqiao | |||
| Guangtaimen | 广泰门 | 3 | Weiyang | ||
| Beichendonglu | 北辰东路 | ||||
| Jingshangcun | 井上村 | 10 | |||
| Yujiazhai | 余家寨 | 4 | |||
| Shidi-sanyiyuan | 市第三医院 | ||||
| Qingshaonianzhongxin[a] | 青少年中心 | 2 | |||
| Bachengmen | 霸城门 | ||||
| Dafengge | 大风阁 | ||||
| Hongmiaopo | 红庙坡 | Lianhu | |||
| Jingyaomen | 景曜门 | ||||
| Guanghuamen | 光化门 | ||||
| Baijiakou | 白家口 | ||||
| Kaiyuanmen | 开远门 | 1 | |||
| Tumen | 土门 | ||||
| Jinguangmen | 金光门 | 5 | |||
| Yanpingmen | 延平门 | 3 | Yanta | ||
| Keji 2 Lu | 科技二路 | ||||
| Mutasixi[b] | 木塔寺西 | 6 [c] 12 | |||
| Shengtiyuguan | 省体育馆 | 6 | |||
| — ↓ Loop line - towards Shanmenkou ↓ — | |||||
Notes
References
- ^ a b c "权威发布丨西安地铁8号(环)线将于12月26日12时开通初期运营". 西安地铁 (in Chinese). 2024-12-25. Retrieved 2024-12-25.
- ^ "建设动态丨西安地铁8号线大白杨站顺利封顶". 西安地铁 (in Chinese). 2021-04-30. Retrieved 2024-12-25.
- ^ "西安地铁8号线即将进入全线动车调试阶段". 新华网 (in Chinese). 2024-06-27. Retrieved 2024-12-25.
- ^ "美好出行与您环环相扣丨市民媒体试乘地铁8号(环)线". 西安地铁 (in Chinese). 2024-12-23. Retrieved 2024-12-25.
