Terminal Skypark Komuter station
| KS03 | |||||||||||
![]() KTM Terminal Skypark station view from Subang Skypark | |||||||||||
| General information | |||||||||||
| Location | Sultan Abdul Aziz Shah Airport Terminal 3, Subang, Selangor Malaysia | ||||||||||
| Owned by | Keretapi Tanah Melayu | ||||||||||
| Line(s) | Port Klang Branch | ||||||||||
| Platforms | 2 side platforms | ||||||||||
| Tracks | 2 | ||||||||||
| Other information | |||||||||||
| Station code | KS03 | ||||||||||
| History | |||||||||||
| Opened | 1 May 2018 | ||||||||||
| Services | |||||||||||
| |||||||||||
Terminal Skypark Komuter station is a newly completed KTM Komuter limited express station located in Subang, Selangor, Malaysia. It was opened on 1 May 2018.
The station serves the Subang Skypark Terminal (Terminal 3) of the Sultan Abdul Aziz Shah Airport, providing the airport with a rail connection to Kuala Lumpur and the rest of Klang Valley.
The station is the terminus of the 10 KL Sentral-Terminal Skypark Line, which shares tracks with the Port Klang Line between KL Sentral station and Subang Jaya station before branching off towards the airport.[1][2]
Location
The station is located immediately across the Subang Airport Highway from Subang Skypark. An open-air car park sits directly in front of the station. Passengers going from the airport building to the station were required to cross a pedestrian bridge and walk through a portion of the car park.
Layout
In contrast to most KTM Komuter stations which are on ground level, Terminal Skypark station is elevated; the ticketing counter and control facilities are on ground level but the train platforms are one floor above ground. This, as well as the Sungai Gadut station, are the only 2 elevated stations in the Komuter system.
Toilets and a surau are available on the ground floor.
The station has two side platforms along two railway tracks. Platform 1 is for trains terminating at the station, while Platform 2 is for trains heading towards Subang Jaya and KL Sentral.

Feeder buses

Since 9 June 2022 buses now stop in front of the station entrance.[3][4]
| Route No. | Origin | Destination | Via | Connecting to |
|---|---|---|---|---|
| 772 | KS03 Terminal Skypark (Subang Skypark) | KJ14 KG16 Pasar Seni | Jalan Lapangan Terbang Subang KJ26 Ara Damansara KD08 SB1 Setia Jaya Lebuhraya Persekutuan KJ21 Asia Jaya KJ19 KL Gateway-Universiti Jalan Pantai Baharu KD01 KJ17 Abdullah Hukum Jalan Bangsar KJ16 Bank Rakyat-Bangsar | T804 |
| T804 | KS03 Terminal Skypark (Subang Skypark) | KG05 Kwasa Sentral | Jalan Lapangan Terbang Subang Jalan Sungai Buloh | 772 |
Gallery
Station
Skypark Terminal linkway
References
- ^ Menon, Priya (8 August 2014). "Work on railway line from Subang airport to KL Sentral has begun". The Star (Malaysia). Retrieved 30 April 2016.
- ^ "Projek Landasan Keretapi dari Subang ke Terminal Skypark Subang" [Railway Project from Subang to Subang Skypark Terminal]. Land Public Transport Commission of Malaysia (in Malay).
- ^ "Ekstra Penjimatan" (PDF). www.ktmb.com.my (in Malay). 2022. Archived (PDF) from the original on June 9, 2022. Retrieved 25 April 2023.
- ^ "772". Retrieved 9 June 2022.
_04.jpg)
_01.jpg)
_02.jpg)
_03.jpg)
_01.jpg)
_02.jpg)
_01.jpg)
_02.jpg)
_03.jpg)
.jpg)
_01.jpg)
_02.jpg)
_03.jpg)
.jpg)
.jpg)
.jpg)
_01.jpg)
_02.jpg)
_03.jpg)
_04.jpg)
_05.jpg)