| Status | Operational |
| Construction began | 2016 |
| Commission date | 2021 |
| Construction cost | 340 million €[1] |
| Owner | Ignitis grupė |
| Thermal power station | |
| Primary fuel | Waste |
| Secondary fuel | Biofuel |
| Power generation | |
| Nameplate capacity | 88 MW (electricity) 227 MW (heat) |
Vilnius Biofuel Power Plant is a waste-to-energy plant in Vilnius, Lithuania.[2][3] The plant produces 40% of all annual heating requirements for the city of Vilnius.[1]
It was built next to decommissioned Vilnius Combined Heat and Power Plant and utilises some of the infrastructure.