Canton Tower station (Tram)
|  | |||||||||||
| General information | |||||||||||
| Location | Haizhu, Guangzhou, Guangdong China | ||||||||||
| Coordinates | 23°06′36″N 113°19′17″E / 23.1100694°N 113.3214618°E | ||||||||||
| Operated by | Guangzhou Metro Co. Ltd. | ||||||||||
| Line(s) | Haizhu Tram | ||||||||||
| History | |||||||||||
| Opened | 31 December 2014[1] 1 July 2025 (rebuild) | ||||||||||
| Closed | 12 November 2024 | ||||||||||
| Services | |||||||||||
| 
 | |||||||||||
| 
 | |||||||||||
Canton Tower station (Chinese: 广州塔站),[2] formerly Canton Tower East station (广州塔东), is a station of Haizhu Tram of the Guangzhou Metro. It started operations on 31 December 2014.[1] The station was closed on 12 November 2024, and was rebuilt and reopened on 1 July 2025 as the new western terminus of the line.
Station layout
| G Platforms | - | Exits | 
| Side platform, doors will open on the right | ||
| Platform 1 |  THZ1  towards Wanshengwei (Liede Bridge South) | |
| Platform 2 | THZ1  termination platform   | |
| Side platform, doors will open on the right | ||
| - | Exits | |
References
- ^ a b "海珠有轨电车试验段31日10时开通试乘". Archived from the original on 30 December 2014. Retrieved 30 December 2014.
- ^ 李天研 (13 June 2025). "广州地铁线网图"上新",加入十、十二号线东西段". 广州日报.
