Changping station (Guangzhou Metro)
![]() Platform 2 | ||||||||||||||||
| Chinese name | ||||||||||||||||
| Simplified Chinese | 长平站 | |||||||||||||||
| Traditional Chinese | 长平站 | |||||||||||||||
| ||||||||||||||||
| General information | ||||||||||||||||
| Location | Guangshan Highway Yongshun Dadao, Huangpu District, Guangzhou, Guangdong China | |||||||||||||||
| Coordinates | 23°12′45″N 113°29′04″E / 23.21247°N 113.48443°E | |||||||||||||||
| Operated by | Guangzhou Metro Co. Ltd. | |||||||||||||||
| Line(s) | Line 21 Huangpu Tram Line 1 | |||||||||||||||
| Platforms | 2 (2 side platforms) | |||||||||||||||
| Tracks | 2 | |||||||||||||||
| Construction | ||||||||||||||||
| Structure type | Elevated | |||||||||||||||
| Accessible | Yes | |||||||||||||||
| Other information | ||||||||||||||||
| Station code | 2111 THP110 | |||||||||||||||
| History | ||||||||||||||||
| Opened | 20 December 2019 | |||||||||||||||
| Services | ||||||||||||||||
| ||||||||||||||||
| ||||||||||||||||
Changping Station (Chinese: 长平站; pinyin: Chángpíng Zhàn) is an elevated station on Line 21 of the Guangzhou Metro that became operational on 20 December 2019.
Station layout
| F4 | - | Passageway between Platforms 1 & 2 |
| F3 Platforms | North Lobby | Customer Service, Vending machines |
| Side platform, doors will open on the right | ||
| Platform 2 | ||
| Platform 1 | 21 towards Zengcheng Square (Jinkeng) | |
| Side platform, doors will open on the right | ||
| South Lobby | Customer Service, Vending machines | |
| F2 Buffer Area | Buffer Area | Buffer area of South Lobby, Station equipment |
| Pedestrian Overpass | Passageway between North & South Lobbies | |
| G Concourse | - | Exits, Station equipment, Shops, Toilet |
Exits
| Exit number | Exit location | |
|---|---|---|
| Exit A | Yongshun Dadao | |
| Exit B1 | Yongshun Dadao | |
| Exit B2 | Yongshun Dadao | |
| Exit C1 | Yongshun Dadao | |
| Exit C2 | Yongshun Dadao | |
| Exit C3 | Yongshun Dadao | |
| Exit D | Yongshun Dadao | |
Gallery
-
West Concourse -
East Concourse -
Platform 1 -
F4 passageway between platforms 1 and 2 -
Exit A -
Exit B1 -
Exit B2 -
Exit C1 -
Exit C2 -
Exit C3 -
Exit D
