Gour Express
![]()  | |
| Overview | |
|---|---|
| Service type | Express | 
| Locale | West Bengal & Jharkhand | 
| First service | April 1980, 20 | 
| Current operator(s) | Eastern Railway | 
| Route | |
| Termini | Sealdah (SDAH) Malda Town (MLDT)  | 
| Stops | 12 | 
| Distance travelled | 349 km (217 mi) | 
| Average journey time | 7 hours 45 minutes in up direction, 7 hours 50 minutes in down direction. | 
| Service frequency | Daily | 
| Train number(s) | 13153/13154 (to Malda Town) | 
| On-board services | |
| Class(es) | First AC, Second AC, Third AC, Sleeper, Unreserved | 
| Seating arrangements | Available | 
| Sleeping arrangements | Available | 
| Auto-rack arrangements | Available | 
| Observation facilities | Large windows | 
| Baggage facilities | Available | 
| Technical | |
| Rolling stock | LHB coach | 
| Track gauge | 1,676 mm (5 ft 6 in) | 
| Operating speed | 44 km/h (27 mph) average with halts | 
Gour Express is an express train of the Indian Railways connecting Kolkata with the district of Malda via Barddhaman , Rampurhat. The train covers a distance of 349.6 km (217 mi) up to Malda with the numbers 13153/54.
Timeline
The Gour Express commenced operations as a triweekly express service between Sealdah and Malda from 20 April 1980. The train proved successful and the then railway minister A. B. A. Ghani Khan Choudhury played a key role in increasing the frequency of the service. On 2 October 1982, he flagged off the first run of the train as a daily service
Important stoppages
- Sealdah
 - Bidhannagar Road
 - Naihati Junction
 - Bandel Junction
 - Barddhaman Junction
 - Bolpur Shantiniketan
 - Ahmadpur Junction
 - Sainthia Junction
 - Rampurhat Junction
 - Nalhati Junction
 - Murarai
 - Rajgram (only for 13154 service)
 - Pakur
 - New Farakka Junction
 - Malda Town
 
Timings
- 13153 leaves Sealdah around 22:05 everyday and reaches Malda Town at 5:55 next day.
 - 13154 departs Malda Town around 21:25 everyday and reaches Sealdah at 5:00 next day.
 
Coach composition
The train consists of 21 passenger coaches. The train runs with the following coach composition -
- 1 Composite 1st A/C
 - 3 A/C 2-tier coaches
 - 2 A/C 3-tier coaches
 - 9 Non-A/C sleeper coaches
 - 4 Unreserved sleeper coaches (UR)
 - 1 Luggage-cum-Guard coaches with unreserved seating (SLR)
 - 1 End on Generation (EOG)
 
Of these, one Luggage-cum-Guard, one unreserved sleeper, three reserved non-A/C sleeper, one A/C 3-tier and one A/C 2-tier coach were used for the through service between Sealdah and Balurghat (now closed).[1]
Traction
As the route from Sealdah to Malda is fully electrified, it is hauled by a Howrah/Sealdah-based WAP-4/WAP-7 throughout its entire journey.
See also
- Old Malda Junction
 - Sealdah railway station
 - Malda Town railway station
 - Gangarampur railway station
 - Balurghat railway station
 
