Grodno Hydroelectric Power Station
| Grodno Dam | |
|---|---|
| The dam under construction in 2008 | |
|   Location of Grodno Dam in Belarus | |
| Country | Belarus | 
| Location | Grodno | 
| Coordinates | 53°38′38.87″N 23°58′24.55″E / 53.6441306°N 23.9734861°E | 
| Purpose | Power | 
| Status | Operational | 
| Construction began | 2008 | 
| Opening date | 2012 | 
| Construction cost | US$118 million | 
| Dam and spillways | |
| Type of dam | Embankment with gravity spillway and powerhouse section | 
| Impounds | Neman River | 
| Height | 17 m (56 ft) | 
| Hydraulic head | 6.9 m (23 ft)[1] | 
| Turbines | 5 x 3.4 MW Kaplan-type | 
| Installed capacity | 17 MW | 
| Annual generation | 84.4 GWh | 
Grodno Hydroelectric Power Station is a run-of-the-river hydroelectric power station on the Neman River, about 8 kilometres (5.0 mi) east of Grodno in Belarus. Construction on the 17 megawatts (23,000 hp) power station began in 2008 and it became operational on 1 September 2012.[2] It is the largest hydroelectric power station in Belarus.[3]
References
- ^ "Designed Projects" (PDF). UHP Kharkova. Archived from the original (PDF) on 26 February 2014. Retrieved 21 February 2014.
- ^ "Grodno hydroelectric energy" (in Belarusian). Belarus News. 10 September 2012. Retrieved 21 February 2014.
- ^ "Grodno HPS: What turned the project" (in Belarusian). Evening Grodno. 19 June 2013. Retrieved 21 February 2014.
External links