Line 2 (Madurai Metro)
| Green Line (Line 2) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Status | Proposed | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Termini |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Stations | 14 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Service | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Type | Rapid transit | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| System | Madurai Metro | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Operator(s) | CMRL | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| History | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Planned opening | December 2027 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Line length | 20 km (12 mi) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Number of tracks | 2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Operating speed | 60 km/h (37 mph) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
The Green Line (Line 2) is one of the three proposed lines of Madurai Metro which is to be implemented at the Phase 2 of Madurai Metro. The line stretches from Kattapuli Nagar to Madurai Airport. The line consists of 14 stations. [1][2]
Stations
The stations proposed in the Phase 2 of Madurai Metro in the Green Line (Line 2) are as follows:- [3][4]
| Green Line (Line 2) | ||||||||
|---|---|---|---|---|---|---|---|---|
| S.No | Station Name | Interchange connection | Places Connected | Layout | Opened | Depot Connection | Depot Layout | |
| English | Tamil | |||||||
| 1 | Kattapuli Nagar | கட்டப்புலி நகர் | None | None | (TBC) | Proposed Phase 2 | Kattapuli Nagar Depot | None |
| 2 | Samayanallur | சமயநல்லூர் | None | None | (TBC) | Proposed Phase 2 | None | None |
| 3 | Athisayam Park | அதிசயம் பூங்கா | None | None | (TBC) | Proposed Phase 2 | None | None |
| 4 | Paravai | பரவை | None | None | (TBC) | Proposed Phase 2 | None | None |
| 5 | Vilangudi | விளாங்குடி | None | None | (TBC) | Proposed Phase 2 | None | None |
| 6 | Fatima College | பாத்திமா கல்லூரி | None | None | (TBC) | Proposed Phase 2 | None | None |
| 7 | Thathaneri | தத்தனேரி | None | None | (TBC) | Proposed Phase 2 | None | None |
| 8 | Sellur | செல்லூர் | None | None | (TBC) | Proposed Phase 2 | None | None |
| 9 | Madurai Junction | மதுரை சந்திப்பு | Meenakshi Amman Temple West Tower, Line 1, Line 3 | Underground | Proposed Phase 2 | None | None | |
| 10 | Therukuvasal | தெற்குவாசல் | None | Meenakshi Amman Temple South Tower, Thirumalai Nayakkar Mahal, Line 3 | Underground | Proposed Phase 2 | None | None |
| 11 | Villapuram | வில்லாபுரம் | None | None | (TBC) | Proposed Phase 2 | None | None |
| 12 | Avaniapuram | அவனியாபுரம் | None | None | (TBC) | Proposed Phase 2 | None | None |
| 13 | Perungudi | பெருங்குடி | None | None | (TBC) | Proposed Phase 2 | None | None |
| 14 | Madurai International Airport | விமான நிலையம் | None | (TBC) | Proposed Phase 2 | None | None | |
See also
References
- ^ "Instagram". www.instagram.com. Retrieved 29 March 2024.
- ^ Balasubramanian, Harini (8 April 2023). "Madurai Metro to link international airport under Phase 2". Housing News. Retrieved 29 March 2024.
- ^ "Madurai metro to link airport in phase II; 5 km to be underground". Retrieved 7 April 2023.
- ^ Staff, T. N. M. (20 February 2023). "Madurai metro: CMRL submits feasibility report, three things to know". The News Minute. Retrieved 29 March 2024.