Station | Community | Location | Capacity (MW) | Status |
Azad Pattan Hydropower Project | Sudhanoti, Azad Kashmir | | 700 | Under construction. To be operational by 2025. |
Balakot Hydropower Project | Mansehra, Khyber Pakhtunkhwa | | 300 | Ready to be constructed in 2020.[10] |
Athmuqam Dam | Athmuqam, Azad Kashmir | | 350 | Ready to be constructed. Korea Hydro & Nuclear Power Corporation won the contract for construction.[11] |
Toren More Project | KPK | | 35 | Ready to be constructed. Sinohydro Corporation China and Sichuan Energy Industry Investment Group Co. Ltd. China won the contract for construction.[12] |
Turtonus-Uzghor Dam | Chitral, KPK | | 58 | Ready to be constructed. Sinohydro Corp Ltd and Sachal Engineering Works Private Ltd won the contract for construction. |
Lower Spat Gah hydropower project | Kohistan, KPK | | 496 | Ready to be constructed.[13] |
Arkari Gol Hydropower Project | Chitral, KPK | | 99 | Ready to be constructed.[14] |
Taunsa Barrage Hydropower Plant | Muzaffargarh, Punjab | | 120 | Ready to be constructed.[15] |
Kohala Hydropower Project | Muzaffarabad, Azad Kashmir | | 1124 | |
Shingo Kas Hydropower Project | Dir, KPK | | 102 | [16] |
Tangir Hydropower Project | Chilas, Gilgit-Baltistan | | 21[17] | Under construction.[18] To be operational by 2028 [19] |
Chianwali Hydropower Project | Gujranwala, Punjab | | 5.38 | Ready to be constructed.[20] |
Deg Outfall Hydropower Project | Gujranwala, Punjab | | 4.04 | Ready to be constructed.[20] |
Okara Hydropower Project | Gujranwala, Punjab | | 4.16 | Ready to be constructed.[20] |
Chashma Hydel Power Project | Mianwali, Punjab | | 5.0 | Ready to be constructed. |
Mahl Hydropower Project | Azad Kashmir | 34°55′N 73°34′E / 34.917°N 73.567°E / 34.917; 73.567 (Mahl) | 590 | Ready to be constructed. China Three Gorges Corporation won the contract for construction.[21] |
Soan Dam | Pothohar Plateau, Punjab | | 5,240 | Proposed.[22][23] |
Shevik | Gilgit-Baltistan, Pakistan | | 4,600 | Planned.[24][25] |
Nekherdim-Paur Dam | Chitral, KPK | | 80 | Ready to be constructed. CTG won the contract for construction.[26] |
Chakothi-Hattian Hydropower Project | Muzaffarabad, Azad Kashmir | | 500 | Ready to be constructed. Chinese firm won the contract for construction. |
Hanzel Hydropower Project | Hanzel, Gilgit | | 20 | Ready to be constructed. Cost estimate $63 million.[27] |
Kalam Asrit | Kalam, KPK | | 197 | Ready to be constructed. KPK government signed MOU with Korea’s state-owned M/S Korea South East Power Company. Cost estimate $500 million.[28] |
Ghowari Hydropower Project | Gilgit-Baltistan | | 30 | Ready to be constructed. Cost estimate $80 million.[29] |
Bara Dam | Tirah, Khyber Agency | | 5.8 | Ready to be constructed.[30][31][32][33] |
Bunji Hydropower Project | Astore District, Gilgit-Baltistan | 35°39′N 74°36′E / 35.650°N 74.600°E / 35.650; 74.600 (Bunji Hydropower) | 7,100 | Ready to be constructed. MOU signed with China’s National Energy Administration.[34] Cost estimate $6.8 billion.[35] |
Kalabagh Dam | Mianwali District, Punjab | | 3600 | Proposed. |
Patan hydropower Project | Patan Village, Indus River | | 2,400 | Ready to be constructed. MOU signed with China’s National Energy Administration.[31][32][33][36] Cost estimate $6 billion.[37] |
Harpo Hydropower Project | Skardu, Gilgit-Baltistan | | 34.5 | Ready to be constructed.[38] |
Thakot Hydropower Project | Battagram District, KPK | 34°45′N 72°55′E / 34.750°N 72.917°E / 34.750; 72.917 (Thakot) | 4,000 | Feasibility studies to be completed by Dec 2017. MOU signed with China’s National Energy Administration[31][32][33] Cost estimate $6 billion.[37] |
Phandar Hydropower Project | Gupis-Yasin District, Gilgit-Baltistan | | 81 | Detailed engineering design or tender of documents under process.[30][33] Cost estimate $128 million .[37] |
Basho Hydropower Station | Skardu, GB, Indus River | | 28 | Detailed engineering design or tender of documents under process.[30][31] Cost estimate $40 million.[37] |
Tank Zam Dam | Hinis Tangi, KPK, Tank Zam River | | 25.5 | Feasibility studies completed.[31] Cost estimate $234 million.[35] |
Hingol Dam | Lasbela District, Hingol River, Balochistan | | 3.5 | Feasibility studies completed. Cost estimate $311 million.[35] |
Akhori Dam | Akhori, Punjab, Haro River | | 600 | Feasibility studies ongoing. Cost estimate $1.6 billion.[37] |
Katzarah Dam | Skardu, Gilgit-Baltistan | | 15,000 | Proposed. |
Middle Palas hydropower project | Kohistan, KPK | | 373 | Feasibility studies ongoing.[31][32][33] Cost estimate $763 million.[35] |
Upper Palas hydropower project | Kohistan, KPK | | 160 | Feasibility studies ongoing.[31][32][33] Cost estimate $763 million.[35] |
Madian Hydropower Project | Swat, KPK, Swat River | | 157 | Feasibility studies ongoing.[39] |
Shushai-Zhendoli Hydropower Project | Chitral, KPK | | 144 | Financing is being arranged for these projects by selling shares in the existing projects.[40] |
Shogosin Hydropower Project | Chitral, KPK | | 132 | Financing is being arranged for these projects by selling shares in the existing projects.[40] |
Latambar Dam | Karak District, Khyber Pukhtunkhwa | | ? | The preliminary feasibility study of the project has been completed and process of site selection completed.[41] |
Mairoobi Dam | Nowshera District, Khyber Pukhtunkhwa | | ? | The preliminary feasibility study of the project has been completed and process of site selection completed.[41] |
Jaroba Dam | Nowshera District, Khyber Pukhtunkhwa | | ? | The preliminary feasibility study of the project has been completed and process of site selection completed.[41] |
Naran Dam | Mansehra District, Khyber Pukhtunkhwa | | 188 | EOI invited.[41] |
Gorband Hydropower Project | Shangla District, KPK | | 14 | The preliminary feasibility study of the project has been completed and process of site selection completed.[41][42] |
Nand Bahar Dam | Battagram District, Khyber Pukhtunkhwa | | 50 | The preliminary feasibility study of the project has been completed and process of site selection completed.[41] |
Mojigram Shagoor Dam | Chitral District, Khyber Pukhtunkhwa | | 50 | The preliminary feasibility study of the project has been completed and process of site selection completed.[41] |
Astar Rabooni Dam | Chitral District, Khyber Pukhtunkhwa | | 50 | The preliminary feasibility study of the project has been completed and process of site selection completed.[41] |
Arkari Gol Dam | Chitral District, Khyber Pukhtunkhwa | | 50 | The preliminary feasibility study of the project has been completed and process of site selection completed.[41] |
Shringal Dam | Upper Dir District, Khyber Pukhtunkhwa | | 50 | The preliminary feasibility study of the project has been completed and process of site selection completed.[41] |
Patrak Barikot Dam | Swat District, Khyber Pukhtunkhwa | | 60 | The preliminary feasibility study of the project has been completed and process of site selection completed.[41] |
Segokatch Dam | Chitral District, KPK | | 60 | The preliminary feasibility study of the project has been completed and process of site selection completed.[41] |
Taunsa Hydropower Project | | | 135 | IPP, RFP has been accepted.[43] |
Shigo Kas Hydropower Project | | | 102 | EOI invited.[43] |
Bata Kundi Hydropower Project | | | 96 | EOI invited.[43] |
Ghorband Khwar Hydropower Project | | | 21 | EOI Iinvited.[43] |
Nandihar Khwar Hydropower Project | | | 12 | EOI invited.[43] |
Winder Dam | Lasbela District, Winder River, Balochistan | | 0.3 | Proposed. Cost estimate $148 million.[35] |
Daraban Zam Dam | Dera Ismail Khan, KPK, Khora River | | 0.75 | Proposed. Cost estimate $69 million.[35] |
Ghabir Dam | Ghabir River | | 0.15 | Proposed. Cost estimate $121 million.[35] |
Papin Dam | Rawalpindi District, Wadala Kas | | 0.3 | Proposed. Cost estimate $101 million.[35] |
Rajhdani Dam | Kotli District, AJK Poonch River | | 132 | EOI invited.[26] |
Gabral Kalam | Kalam, Khyber Pakhtunkhwa | | 101 | LoS issued. |
Bhadi Dhoba Hydropower Project | Haveli District | | 1 | Proposed. |
Galeter Hydropower Project | Kotli District | | 1 | Proposed.[44] |
Saridoa Cross Hydropower Project | Bhimber District | | 1.7 | Proposed. |
Chamfall Hydropower Project | Hattian District | | 6.4 | Proposed.[44] |
Guddu Hydropower Station | Kashmore, Sindh | | 33 | Proposed. |
Harighel Hydropower Project | | | 53 | Proposed. |
Sehra Hydropower Project | Azad Kashmir, Poonch River | | 130 | Proposed. |
Nagdar Hydropower Project | Neelum, AJK, Jagran River | | 25 | Proposed.[45] |
Duwarian Hydropower Project | Hattian Bala, AJK, Jagran River | | 29 | Proposed.[45] |
Asrit-Kedam Hydropower Project | Kalam, KPK, Swat River | | 215 | LOI issued by PEDO, KPK to Korea's state-owned company, M/S Korea South East Power Company (KOEN) working through KOAK Power Limited. |
Karang Hydropower Project | | | 458 | Proposed. |
Shogo-Sin Hydel Dam | | | 132 | Proposed. |
Shushgai Zhendoll | | | 144 | Proposed. |
Yogo, Pakistan | | | 500 | Proposed. |
Thor Hydropower Project | | | 3.6 | Proposed.[35] |
Yulbo Hydropower Project | | | 3000 | Proposed.[37] |
Shyok Hydropower Project | | | 520 | Proposed.[37] |
Tungus Hydropower Project | | | 2200 | Proposed.[37] |
Skardu Dam | Skardu | | 1600 | Proposed.[37] |
Dudhnial Hydropower Project | | | 960 | Proposed.[37] |
Kundal Shahi Hydropower Project | | | 960 | Proposed.[37] |
Trappi Hydropower Project | | | 32 | Proposed.[37] |
Nandihar Hydropower Project | Battagram, Khyber Pukhtunkhwa | | 10 | Proposed.[42] |
Mujigaram Shagore Hydropower Project | Chitral, Khyber Pukhtunkhwa | | 51 | Proposed.[42] |
Istaro Booni Hydropower Project | Chitral, Khyber Pukhtunkhwa | | 52 | Proposed.[42] |
Arkari Gol Hydropower Project | Chitral, Khyber Pukhtunkhwa | | 79 | Proposed.[42] |
Total proposed generation | | | 60,764+ | |