Maria Gleta Power Plant
| Maria Gleta Power Plant | |
|---|---|
| Country | Benin |
| Location | Godomey, Atlantique Department |
| Coordinates | 6°25′34.3″N 2°18′23.5″E / 6.426194°N 2.306528°E |
| Status | Operational |
| Construction began | 2017 |
| Commission date | 2019 |
| Thermal power station | |
| Primary fuel | Natural gas |
| Power generation | |
| Units operational | 7 |
| Nameplate capacity | 127 MW |
The Maria Gleta Power Plant is a gas-fired power plant in Godomey, Atlantique Department, Benin.
History
The power plant was inaugurated on 29 August 2019 after two years of construction works.[1][2]
Technical specifications
The power plant has an installed capacity of 127 MW. It consists of seven generators.[1]
See also
References
- ^ a b "MAN Energy Solutions Inaugurates New Dual-Fuel Power Plant in Benin". MAN Energy Solutions. 30 August 2019. Retrieved 20 October 2023.
- ^ "Maria-Gléta power plant". Caisse Autonome d'Amortissement. Retrieved 20 October 2023.