Sétif tramway
| Sétif Tramway | |||
|---|---|---|---|
![]() | |||
| Overview | |||
| Native name | ترامواي سطيف | ||
| Locale | Sétif, Algeria | ||
| Transit type | Tram | ||
| Number of lines | 1 | ||
| Number of stations | 26 | ||
| Operation | |||
| Began operation | 8 May 2018 | ||
| Technical | |||
| System length | 15.2 km (9.4 mi) | ||
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
| |||
The Sétif Tramway (in Arabic: ترامواي سطيف) is a system of public transport in Sétif, Algeria. The first section includes 15.2 kilometres (9.4 mi) of route and 26 stops.[1]
The Sétif Tramway was built and equipped by a joint venture of Alstom and Turkey-based construction company Yapı Merkezi.[2]
The Sétif Tramway commenced public services on 8 May 2018.
References
- ^ "First tram line inaugurated in the city of Sétif, Algeria". www.globalrailnews.com. Rail Media Company. 9 May 2018. Retrieved 2018-05-11.
- ^ "Sétif opens first light rail line". International Railway Journal. 2018-05-09. Retrieved 2021-08-28.

